Joinery and fit-out

Management software for joinery and fit-out companies

A fit-out job crosses two worlds with neither the same rhythm nor the same vocabulary: the workshop, which produces, and the site, which installs. Most delays are born at the handover between them.

What your trade computes that others do not

You do not sell a catalogue, you sell a piece that will exist only once it has been measured. The chain runs from site measurement to drawing, drawing to cutting list, cutting to manufacture and then to installation, and each link depends on the last. A dimension corrected after release to the workshop does not cost a correction, it costs a remake — which is why traceability of the measurement and its approval is worth as much here as the pricing.

Workshop load is then the real production constraint, and it does not read in a calendar. A job consumes machine hours and bench hours over a given period; accepting a delivery date asserts that capacity remains in that period. Without a consolidated view of load, the promise made to the client is a bet, and that bet is paid in overtime the following month.

Then come supply and deposits, which govern cash. Panels, ironmongery, glass or worktops arrive with long and sometimes immovable lead times: an order placed too late pushes installation back by weeks. Facing them, the deposit on order, the balance on handover and any retention set the rhythm of receipts. Bringing those two calendars together job by job is what separates a firm that meets its dates from one that endures them.

What most workshops work around by hand

None of this is dramatic: these are the places where a job loses two days nobody can account for.

  • Site measurements are taken on a notepad and re-keyed at the office.
  • Workshop load is estimated by eye in front of a wall planner.
  • Supplier orders are placed when someone remembers the lead time.
  • Deposits are tracked in a spreadsheet separate from the job.
  • Workshop hours and installation hours are mixed into one total.
  • A job's cost price is known when the bookkeeper closes it.

What we have not done here yet

No engagement in the portfolio covers this sector. We would rather write that than let it be assumed. Here is the closest one by its management rules:

HVACJobs and field reports for an HVAC installerA single tool to track jobs, schedule interventions and produce field reports, replacing a general-purpose task manager pushed well past its purpose.Read the full case study

Frequently asked questions

Can workshop load and the installation schedule be tracked together?
That is precisely the point of a tool built for this trade. Installation depends on manufacture, manufacture depends on supply: keeping them in three separate planners means steering none of the three. One job carries its milestones, and a slip on one shows immediately on the others.
Does the tool replace CAD or cutting-optimisation software?
No, and it would be a bad idea. Those tools do specialised work nothing justifies rewriting. What is missing sits around them: the link between the commercial job, production and actuals. The useful data moves between the two instead of being re-entered.
Can workshop hours be separated from installation hours?
Yes, and it is essential to understanding where margin goes. A job can be well priced in manufacture and lost on site, or the reverse; while both accumulate in one total, the gap against the quote is observed without ever being explained.
Has Zora worked for a joiner or fit-out firm?
No, and we will not imply otherwise. The closest thing in the portfolio is an HVAC installer, where the quote-to-job mechanism, hours booked in the field and cost price rebuilt as work happens all recur. Workshop production is a constraint specific to your trade: it is designed with you rather than transposed.